Planning and Scheduling

A live, current schedule, rather than a bar chart viewed only once at the start of the project.

Developing the baseline schedule and updating it periodically.

What Issues Do You Typically Face?

In many projects, the schedule remains an initial bar chart that is never regularly compared with actual progress or updated. Consequently, nobody knows precisely how far the project is ahead of or behind schedule, or why.

Why Does Addressing This Properly Matter?

Without a live, updated schedule, delays are usually identified late and their actual causes, such as resource shortages, delayed decisions or procurement problems, are obscured. This makes defending either party's position difficult when disputes or delay claims arise.

Service Process

1
Develop or review the baseline using realistic sequencing and resources
2
Collect actual activity progress periodically
3
Update the schedule and compare it with the baseline
4
Analyse the critical path and activities at high risk of delay
5
Report conditions and recommend corrective action

Required Documents and Information

  • Project drawings and technical specifications
  • Activity list or work breakdown structure
  • Available workforce, equipment and materials
  • Contract and contractual deadlines
  • Periodic site progress reports

Specialist Considerations, Controls and Risks Examined

Activity logic that does not account for actual execution constraints
Resource constraints ignored during planning, producing an unrealistic schedule
Incorrect identification of the critical path and misleading float
Delays and their causes not documented promptly
Change instructions omitted from the updated schedule

Outputs and Deliverable Documents

  • Baseline schedule
  • Periodic schedule updates
  • Critical path analysis report
  • Schedule variance report and causes

Ways to Work Together

Available as a one-off schedule development service or ongoing updating and periodic monitoring during execution.

Frequently Asked Questions

+Which scheduling software do you use?

The tool is selected according to the client's needs and procedures. Sound scheduling logic and realism matter more than the software alone.

+What if the contractor has no schedule?

In that case, developing the baseline from the beginning is included in the service scope.